Step 1
- Process equipment
- HVAC Process air
- Clean Utilities – Black Utilities
- Building Autimation System
- Electrical System
- Clean Room Construction
- Design of Production building
+Energy center
+Warehouse+Building Lab and offices
|
Step 2
- Finalization of Conseptual Design
- Basic design – Plant layout on Architectual drawing Evaluation
- Bill of Quantities of material for Construction of GMP areas
- Schematics for
Machanic,Electrical, and Piping
- Infrastructure and clean room technology
|