ΕΡΓΑ

ONE PHARMA INDUSTRIAL PHARMACEUTICAL S.A.

Project
Conseptual of Clean Room area for multi purpose plant
Client Location
ONE PHARMA Schimatari – Greece
Period TIC
July 2023 Confidential
Scope
  • Utility systems
  • Ventilation sytem
  • Building automation system, Clean room monitoring
  • Clean room construction
  • GMP-consulting
  • Qualification of production & packaging equipment
One 300x201

KORRES S.A.

Project
Clean Room construction  – expansion of packaging area
Client Location
KORRES 300x240 Oinofyta – Greece
Period TIC
May – September 2021 Confidential
Scope
  • Installation of Clean room Panels, Ceiling, Door, Lights, Airlocks, Pass through boxes
Korres1 2 300x217
Korres 300x197

WinMedica S.A.

Project
Conseptual of Clean Room area for high potent drugs
Client Location
Winmedica Logo 1a Tripolis – Greece
Period TIC
April  –  August  2021 Confidential
Scope
  • Utility systems
  • Ventilation system
  • Building automation system, Clean room monitoring
  • Clean room construction
  • GMP-consulting
  • Qualification of production & packaging equipment
 τίτλο 300x294

SYNLAB S.A.

Project
Clean Room construction
Client Location
Syn Lab Logo Clean 300x201 Korinthos – Greece
Period TIC
January  –  June  2021 Confidential
Scope
  • Infrastructure and clean room technology
  • Installation of Clean room Panels, Ceiling, Door, Lights, Airlocks, Pass through boxes
  • Flooring
2 SYNLAB 300x225
1 SYNLAB 300x225

FAMAR S.A.

Project
New Sterile Manufacturing Facility
Client Location
0WYgmeSmzww0xSS Comp245041 300x91
Avlonas 48/ Greece
Period TIC
2020
~ 20 mill EUR
Scope
  • Construction of a New Sterile Manufacturing Facility, incl. QC labs, offices etc., located within an existing warehouse building, Total space ~5.300 m2
  • 6x Filling lines: 2x Ampoules, 2x Eye drops, 2x (future) lines
  • Each Filling line as separated (fully encapsulated) module
  • Containment technology, VHP / IHP, CIP / SIP for compounding and filling
  • Terminal sterilization as central area, Leak testing (alternative methods)
  • Incl. all required equipment up to packaging
  • Keeping existing warehouse with max number of usable Pallet places
  • Creating a modern and efficient QC lab area
  • HVAC – Filter Fan Units (FFU’s), H2O2 Decon
  • Services: Feasibility study, Layouting, TIC Cost estimates, Time Schedule
F2
F1 300x179
F3
F4

BENNETT PHARMACEUTICALS S.A.

Project
New Multi-Purpose Production Facility
Client Location
Bennett Logo 300x158
Kifissia / Athens – Greece
Period TIC
2020
~ 30 mill EUR
Scope
  • Transformation of an existing 3-Levels building (~4.200m2) into a production building for:
  • Oral solid dosage forms (coated and not coated tablets, capsules), ~1 bill units/year
  • Non-sterile liquid forms (oral solutions in bottles) – batch size ~2.000L
  • Production Support functions, including: Warehouse, Laboratory for Physico-chemical testing, Microbiological Laboratory, Office (QA, QC, Production), Administration, Meeting rooms, Utilities generation and infrastructure
  • Services: Concept Design, Investment Cost estimates, Time Schedule
Ben1 300x130
Ben2 300x67
Ben3 300x67
Ben5 300x67
Ben4 300x58

PharOS MT Ltd

Project
New Production Facility for Oncology Products
Client Location
PharOS Logo 300x180 Comp245509
Birzebbugia, Malta
Period TIC
2019
~ 6 mill EUR
Scope
  • A New Production Facility for OSD Oncology Products (up to OEB3)
  • Coated tablets and hard gelatin capsules
  • Bulk production and primary packaging
  • Process units: API Dispensing, Granulation, Blending, Tableting / Capsuling, Coating, Primary Packaging, Washing, Process support equipment
  • Housed in an upgraded Pilot Plant area
  • 1 level, Total area ~370 m²
  • Services: Concept design, (Extended) Basic Design, 3D model, all trades, Equipment URS’s
  • Qualification (Risk assessment, VMP, GMP review)
Ph1 300x156
Ph2 300x143

SPECIFAR S.A.

Project
Clean Room maintenance
Client Location
Specifar S A 300x103 Agia Varvara- Attica

Greece

Period TIC
June – September 2019 Confidential
Scope
  • New granulation area expansion
  • Maintenance of existing Clean rooms
  • New ceiling and ducts
Specifar 225x300

IASIS PHARMA HELLAS S.A.

Project
Conseptual Design of New pharma plant     (Step 1)
Basic Engineering design                               (Step 2)
Client Location
Iasis Logo Png Comp245498 Koropi – Greece
Period TIC
Step 1   Jan 2017 – May 2017

Step 2  June 2017 – September 2017

Confidential
Scope
Step 1
  • Process equipment
  • HVAC Process air
  • Clean Utilities – Black Utilities
  • Building Autimation System
  • Electrical System
  • Clean Room Construction
  • Design of Production building
    +Energy center
    +Warehouse+Building Lab and offices

Step 2

  • Finalization of Conseptual Design
  • Basic design – Plant layout on Architectual drawing Evaluation
  • Bill of Quantities of material for Construction of GMP areas
  • Schematics for
    Machanic,Electrical, and Piping
  • Infrastructure and clean room technology
1

Adelco S.A.

Project
Construction of new sterile clean room and API warehouse
Client Location
AdelcoLOGO 1 1 Greece
Period TIC
2017
Confidential
Scope
The construction of :
  • New sterile clean room 450mfor Injectable products
  • Warehouse 950mfor APIs with Greek clean room panels
  • Weighing booth with Class D condition
01 1030x775
16

Anfarm Hellas S.A.

Project
Renovation of existing clean room
Client Location
AAEAAQAAAAAAAAibAAAAJDkzNTJkOTNjLWUxMjQtNGEzMi05ZTNmLTY4ZGU1YjIxOTFhOA Greece
Period TIC
2016
Confidential
Scope
IMG 20170306 100255 300x225
IMG 20170120 143857 300x169

Pharmathen S.A.

Project
New Sterile Area-Lai Project
Client Location
PharmathenLogo Alexandroupolis-

Northern Greece

Period TIC
2015
Confidential
Scope
Img1 300x225
Photo 18 2 16 12 57 50 300x225

Roumpoulaki

Project
New repacking clean room area
Client Location
Logo1 Greece
Period TIC
2014
Confidential
Scope
Img3 300x215
Img4 300x208

Galenica

Project
Clean Rooms
Client Location
Logo GreeceAthens
Period TIC
2012
Confidential
Scope
  • New clean room for Injectables in Ampoules 
Img5
Img6

IASIS Pharma

Project
Production Area
Client Location
Iasis Logo Png Comp245498 GreeceAthens
Period TIC
2011-2012
Confidential
Scope
  • New Effervescent tablets production area
Img7
Img8
Img9

CHIPITA S.A.

Project
Feasibility Study
Client Location
Chipita Logo280x280 GreeceAthens
Period TIC
October 2011
Confidential
Scope
  • Feasibility study for croissant production plant in Lamia.
Chipitas

ALAPIS S.A.

Project
Revamp of the Solid, Semisolids and Lidids Production Facility
Client Location
1 Greece Athens
Period TIC
2008 – 2010 Confidential
Scope
  • Conceptual Design
  • Basic Engineering
  • Detail Engineering
  • Turn Key Realization
  • Qualification
ALAPIS4
ALAPIS1

SPECIFAR S.A.

Project
Conseptual Design of New pharma plant (Step 1)
Basic Engineering design                                 (Step 2)
Client Location
Specifar Schimatari – Viotia
Period TIC
Step 1    May 2008 – July 2008
Step 2    July 2008 – Jan 2009
Confidential
Scope
Step 1
  • Process equipment
  • HVAC Process air
  • Clean Utilities – Black Utilities
  • Building Autimation System
  • Electrical System
  • Clean Room Construction
  • Design of Production building
    +Energy center
    +Warehouse+Building Lab and offices
Step 2
  • Finalization of Conseptual Design
  • Basic design – Plant layout on Architectual drawing Evaluation
  • Bill of Quantities of material for Construction of GMP areas
  • Schematics for
    Machanic,Electrical, and Piping
  • Infrastructure and clean room technology
Spesifar1

IONIOS PHARMA

Project
Conceptual design of New Pharma plant (Revamp existing building)
Client Location
IONIOS2 Tviva- Viotia
Period TIC
March – May 2008 Confidential
Scope
  • Utility systems
  • Ventilation system
  • Building automation system, Clean room monitoring
  • Clean room construction
  • GMP – consulting
  • Qualification of production equipment and laboratory equipment
IONIOS1

KORRES S.A.

Project
Clean rooms in Plant B’
Client Location
Korres Greece – Inofyta
Period TIC
2007 – 2008
Confidential
Scope
  • Construction of Clean room area 1200m2 for production and packaging of Cosmetic products
Korres2
Korres3

PHARMATHEN S.A.

Project
Conceptual Design of New solid production pharma Plant
Client Location
PharmathenLogo Alexandroupolis – Nother Greece
Period TIC
October 2005 – March 2006 Confidential
Scope
  • Conceptual Design – Facility systems
  • Black Utilities
  • Building Automation
  • Qualification/Validation
  • Electrical system
  • Civil and Stractual works
  • Cost estimations
PHARMA1
PHARMA2

GEROLYMATOS S.A.

Project
Clear rooms in Plant B’
Client Location
Gerolymatow Greece Athens
Period TIC
October 2004 Confidential
Scope
  • Clear room construction of Production area (tablets).
GEROLYMATOS2
GEROLYMATOS1 212x300

ELPEN S.A.

Project
Clean rooms
Client Location
ELPEN Greece Athens
Period TIC
August 2004 Confidential
Scope
  • Construction of Clean room production area for Penicillin products.
Elpen1
ELPEN2 177x300

RAFARM S.A.

Project
Design of tabletting and packing facility
Client Location
RAPHARM Paiania – Athens
Period TIC
May – March 2004 Confidential
Scope
Design of New tabletting and packing facility
  • User requirement specificatios (process, equipment, building concept)
  • Conseptual design
  • Personel and material flow
  • Hygienic and pressure zones
RAFARM

BOEHRINGER INGELHEIM HELLAS S.A.

Project
Optimization of Production Plant
Client Location
Boehringer Koropi – Athens
Period TIC
April – June 2003 Confidential
Scope
  • Step 1 – Feasibility study (development for the production in complience with the cGMP) and Optimization of Production Plant
  • Step 2 – Commissioning and qualification HVAC/Cleanrooms (September 2005)
Boehringer1

BIOKOSMOS LAB

Project
Clean rooms
Client Location
Biokosmos Greece Lavrio
Period TIC
2003 Confidential
Scope
  • Construction of  Laboratory Clean room area. (production of radio medicines by Cyclotron)
BIOKOSMOS1
BIOKOSMOS1

MEDISPES S.A.

Project
Clean rooms
Client Location
MEDISPES Greece Larisa
Period TIC
2002 Confidential
Scope
  • Clean room construction  for  Medical devices (Sterile area).
MEDISPES2
MEDISPES1

SPECIFAR S.A.

Project
Clean rooms
Client Location
Specifar Greece Athens
Period TIC
2001 – 2002 Confidential
Scope
  • Construction of Clean room production area for  Tablet production facility.
SPECIFAR1
SPECIFAR2